Limits of grid extension in the Lao PDR: A financial perspective

  • Julius Susanto

Abstract

This paper articulates a financial model for estimating the limits of grid extensionin the Lao PDR versus three decentralised renewable energy (DRE) options: micro-hydropower,pico-hydropower and solar photovoltaic. The model is based on a like-for-like comparison of thedifferent DRE options against grid extension, such that each option supplies the same amount ofelectricity (in kWh) over the project timeframe. The amount of electricity supplied is estimatedbased on the forecast electricity demand of a typical rural Lao household. Therefore, if a householdconsumes 7 kWh per day, then the micro-hydro, pico-hydro, solar PV and grid extension systems areall sized in the model to supply 7 kWh per day. This is in contrast to more conventional approaches,where grid extension is compared to DRE systems of typically lower capacities (e.g. grid extensioncompared against 50 W solar home systems). The limits of grid extension are expressed in termsof a breakeven distance, which is the maximum distance from a village at which grid extension isthe more cost-effective option. Beyond this breakeven distance, DRE technologies can be installedat a lower cost, while providing the same amount of electricity to the end-user.

References

Cross, N., and Gaunt, C. T., 2003, Application of Rural Residential Hourly Load Curves in Energy Modelling, IEEE Bologna Power Tech Conference.

Dhungel, P., 2009, Financial and Economic Analysis of Micro-Hydro Power in Nepal, MSc Thesis, University of Minnesota.

Electricite du Laos, 2010, Power Development Plan 2010-2020, Lao PDR.

Electricite du Laos, 2011, Electricity Statistical Yearbook 2010, Lao PDR.

Fall, N., et al, 2007, Remote Area Power Supply (RAPS) Load and Resource Profiles, Sandia National Laboratories, Report SAND2007-4628.

Goldsmith, K., 1993, Economic and Financial Analysis of Hydropower Projects, Norwegian Institute of Technology.

Greacen, C., 2004, The Marginalization of “Small is Beautiful“: Micro-hydroelectricity, Common Property, and the Politics of Rural Electricity Provision in Thailand, PhD thesis, University of California, Berkeley.

IEA, 2005, Projected Costs of Generating Electricity – 2005 Update, OECD.

Ketjoy, N., 2005, Photovoltaic Hybrid Systems for Rural Electrification in the Mekong Countries, PhD dissertation, University of Kassel, Germany.

Lao Institute for Renewable Energy, 2011, Decentralised Production of Electricity in Lao PDR (on and off-grid) – Scoping Phase Final Report, Lao PDR.

Nippon Koei / Lao Consulting Group, 2010, Rural Electrification Master Plan – Final Report – Volume 1: Task Part A, Lao PDR.

Vaidya, 2002, Cost and Revenue Structures for Micro-Hydro Projects in Nepal, AEPC.

World Bank, 2006, Technical and Economic Assessment of Off-Grid, Mini-Grid and Grid Electrification Technologies – Annexes, Washington DC

Published
2012-12-31
Section
Articles